Mt. Kilimanjaro: Dave Hahn and Team Arive in Africa!

Posted by: Dave Hahn | September 15, 2013
Categories: *Expedition Dispatches *Kilimanjaro

It is 11 PM at the Dik Dik Hotel near Arusha, Tanzania, and the entire climbing team has made it through the worldwide obstacle course of airports and aircraft to begin a Kilimanjaro expedition.  We’ll get started in the morning with strategizing and packing gear and prepping, but for now it it just a great relief to have everybody in one place (the correct place) and to have all the baggage safely off the carousels.

Our drivers and hotel staff gave each tired traveler a friendly hello, a handshake, a glass of champagne and a flower or two.  The kitchen stayed up late to get an excellent dinner out to each and every climber.
We’ll hope that a night’s good rest goes a long way to refreshing, rebooting and rejuvenating the gang.  An adventure is waiting.

Best Regards,

RMI Guide Dave Hahn

The Dik Dik Hotel pool area. Photo: Jeff Martin

Sign Up For Kilimanjaro 2013 Email Alerts

250 views

Comments

Thanks for taking such good care of everyone. :)

Posted by: Mara on 9/15/2013 at 3:31 pm

Leave a comment for the team


* required fields