×

Log In

Need an RMI account? Create an account

Register With Us

Already have an account?

*required fields

The password must meet the following criteria:

  • At least 8 characters
  • At least 1 lowercase letter
  • At least 1 uppercase letter
  • At least 1 number
  • At least 1 symbol (allowed symbols: !?@#$%^&/*()[]{}><,.+-=;)

Keep up to date with information about our latest climbs by joining our mailing list. Sign up and we'll keep you informed about new adventures, special offers, competitions, and news.

Privacy Policy

×
×

Check Availability

RMI Logo

Entries from Mount Rainier


RMI’s Solar Snow Melt System on Mt. Rainier

Camp Muir and the Cowlitz Glacier (Jon Mancuso) Every summer, RMI climbing teams consume over 7,000 gallons of drinking water at Camp Muir, the primary camp on Mt. Rainier's Disappointment Cleaver Route. For many years, melting snow in a large barrel heated by propane created drinking water for Camp Muir. We knew that there was a better way to provide drinking water to our teams and it just required a little bit of creativity, brainstorming, and initiative. Over the course of the 2012 and 2013 climbing seasons, a new solar thermal system was installed at Camp Muir. This system, designed to use environmentally benign and free solar energy to efficiently melt snow, provides drinking and cooking water for RMI climbers and guides at an elevation of 10,060'. The system was designed and built by RMI Guide and alternative energy professor Mike Uchal and his colleague Dr. Brian Raichle, who is a professor of solar energy technology at Appalachian State University. RMI Guide Cody Doolan also contributed with the design, installation, and maintenance. RMI's Solar Snow Melt System, part of our commitment to Responsible Climbing, reduces our environmental footprint on Mt. Rainier by minimizing the need to burn liquid propane gas in order to melt snow, cuts our operating costs, and reduces the environmental footprint of the helicopter used to transport propane to Camp Muir. Diagram of RMI's Solar Snow Melt System at Camp Muir How it works: A small electric pump powered by photovoltaic panels pulls water from the burn barrel, a large barrel used to melt snow, uphill to a solar thermal collector. The collector, a conventional flat plate solar thermal collector is the kind that is typically used in residential and commercial domestic hot water systems. The water is pulled by gravity through the copper pipes in the collector and is heated by solar radiation before returning to the melt barrel. RMI guides keep the barrel fed with clean snow from the snowfields above Camp Muir and this snow mixes with the warm water and melts into liquid form. A controller turns on the pump in the morning and off at the end of the day when the sun goes down. Because the collector is uphill of the barrel, gravity drains water from the collector at night to prevent damage from freezing water. This system design eliminates any problems associated with overheating during late season conditions when solar energy can be plentiful and strong. RMI Guide Mike Uchal showing the Solar Snow Melt System at Camp Muir to a climber (Mike Uchal). How it performs: On warm, sunny days at Camp Muir, typical in the late summer, the solar snow melting system heated the 30+ gallons of water in the burn barrel to above 100°F. That is nearly spa temperature! On cold, sunny days, often found early in the season, the system heated water to temperatures above 40°F - enough to effectively melt snow. Propane is still used during storms that last several days, when solar radiation isn’t strong enough to heat the collector, but the solar snow melting system dramatically reduced the amount of propane burned during the 2013 summer climbing season. The solar collector at Camp Muir (Mike Uchal). The system's stainless steel water barrel (Mike Uchal). Anecdotally, before the 2013 climbing season the propane burner was running for around 3.5 hours per day to melt enough snow to provide drinking water for the RMI teams. During the 2013 climbing season, guides estimate that the burner was needed on average around 15 minutes per day. During the summer climbing season of 2013, we estimate the solar system saved approximately 250 pounds of propane, the associated cost of transport that propane, and 0.33 metric tons of CO2 emissions. This project is part of RMI’s commitment to the outdoor community and environment as we work to reduce the environmental footprint of our climbs in order to ensure that many future generations are able to enjoy the same mountain environment that we enjoy. The RMI Solar Snow Melt System is a great example of practices that can reduce a business' environmental footprint and provide cost savings at the same time. By the end of its first full year at Camp Muir, the system paid for itself with savings in fuel and helicopter transport costs. The next time you make it to Camp Muir, swing by the guide shack and check it out! The guides would love to show you the system in person. _________ Mike Uchal is a Professor of Alternative Energy at Appalachian State University and guides trips on Mt. Rainier and Mt. McKinley for RMI Expeditions. Mike lives the mountain life, rock climbing, paddling whitewater, mountain biking, trail running, and skiing whenever he has spare time.
Leave a Comment For the Team (2)

Thanks for sharing such an amazing informations.
Very helpful.

Rachel

snow and ice melters

Posted by: Rachel on 1/16/2019 at 5:46 pm

http://www.rmiguides.com/blog/2014/06/05/mt._rainier_expedition_skills_seminar_muir_reaches_summit

Hello folks looking for the skills seminar this week. There was a posting yesterday but not under Rainier. The above link will take you to a great picture!

Posted by: Doug on 6/6/2014 at 4:13 pm


Mt. Rainier: June 2nd Summit

The Four Day Summit Climb led by RMI Guides Seth Waterfall and Pablo Puruncajas reached the summit of Mt. Rainier this morning. The teams are descending to Camp Muir to rest and refuel before making their way to Paradise. We look forward to seeing them in Ashford later today.
Leave a Comment For the Team (2)

I am awestruck!!! You two rock! Stay safe!

Posted by: Debbie Reese on 6/9/2014 at 6:24 am

Goes?  If so, congrats on reaching the summit. Standing by for photos and stories.

Posted by: Chris Krivonyak on 6/2/2014 at 9:33 pm


Mt. Rainier: Remembering Our Climbing Friends

Our thoughts are with our friends at Alpine Ascents and with the family and relatives of the guides and climbers involved in the climbing accident on Mt. Rainier. The climbing community is tightly knit and we feel the loss deeply. Our sincerest thoughts and prayers go out to all of those involved. Please join the climbing community for a memorial service for Eitan Green and Mathew Hegeman: Saturday, June 21, 2014 | 3 - 5 pm The Mountaineers | 7700 Sandy Point Way NE | Seattle, WA 98115 - The RMI Team
Leave a Comment For the Team (2)

My heartfelt condolences.  A painful and poignant reminder that these professionals only make climbing LOOK easy and without risk.

Posted by: Danny Bobrow on 6/17/2014 at 2:04 pm

God Bless those who were taken “home” during this part of their life’s journey. May peace come to the family and friends of all.
Please forgive the commercialism attached to this ... but i simply cannot think of a better song for those who were called to ... and from ... the mountain !!!!!

http://youtu.be/XxNYvzXQ3m4

Posted by: Kathy Wolf on 6/2/2014 at 2:14 pm


Mt. Rainier: June 1st Summit Climb Update

The Four Day Summit Climb led by Kel Rossiter and the Five Day Summit Climb led by Mark Falender reached the summit of Mt. Rainier this morning. Kel reported calm and sunny conditions, a beautiful day on top. They are descending back to Camp Muir and we look forward to welcoming them back in Ashford later this afternoon.
Leave a Comment For the Team (1)

Wonderful that the weather has cleared for the top-out.  We received a note early yesterday from Alysse that all was well—that was important!  Thanks and we will see and talk with you soon.

Posted by: Bill Rossiter on 6/1/2014 at 2:48 pm


Mt. Rainier: May 31st Summit!

The Four Day Summit Climb led by RMI Guide Casey Grom reached the summit of Mt. Rainier at about 7:35am PT. The team reported clear skies and calm climbing conditions. The team will spend some time on the Summit before starting their descent to Camp Muir. Congratulations to today's team!
Leave a Comment For the Team (2)

Looking for info on Sheldon Spivey a Georgia climber who is there attempting to summit Rainer

Posted by: Diana Spivey on 6/1/2014 at 8:58 am

Reading the sad news from MT Rainier - it does not
appear to be Robert’s team led by Matt Emht that
was lost but a team led by Matt Hegeman taking the Liberty Ridge route.

Prayers to all involved.

Posted by: Mitchell on 6/1/2014 at 7:53 am


Mt. Rainier: Camp Muir Seminar Summits!

Hi there, we are having a great summit day! We left Camp Muir at 4 am and reached the summit at 9:15. The weather has been very nice. We are making our way down the mountain now. We'll check in when we get back to Camp Muir. RMI Guide Seth Waterfall
Leave a Comment For the Team (2)

Congratulations! Welcome Home!

Posted by: Gary & MaryJohnson on 5/30/2014 at 1:25 pm

Dear Bob!!

Be Safe & Good Luck!!!!!!

Will Reed

Posted by: Will Reed on 5/30/2014 at 12:35 pm


Mt. Rainier: Expedition Skills Seminar Ascends to Camp Muir

Hi this Seth. I'm up at Camp Muir with this week's Expedition Skills Seminar. We had a really fun walk up the Muir Snowfield today. We had expected rain and it started out like that but after a couple of hours we broke into some sun! The clouds were in and out for the rest of the day so we stayed pretty dry. We are all settled in at camp now getting ready for our first night on the mountain. RMI Guide Seth Waterfall
Leave a Comment For the Team (2)

Go Old Sheep!  #WPStrong

Posted by: Eric on 5/29/2014 at 4:13 pm

Proud of each of you. Additional support and good wishes coming from east coast for Dave Johnson! Looking forward to seeing more photos.
Hugs.

Posted by: garymaryj on 5/28/2014 at 5:54 pm


Mt. Rainier: Four Day Summit Climb Turns Around Due to Poor Weather

The Four Day Summit Climb May 23 - 26, 2014 was forced to turn around at the top of Disappointment Cleaver today due to poor weather. RMI Guides Eric Frank and Pablo Puruncajas made the call to start the descent. The team will return to Camp Muir and then start their descent to Paradise later this morning. We look forward to seeing everyone at Rainier BaseCamp this afternoon.
Leave a Comment For the Team (1)

Be safe and finish strong. You showed courage, strength, and good judgement!

Posted by: julie grooms on 5/26/2014 at 2:11 pm


Mt. Rainier: Teams Forced to Turn Due to Weather

The Four Day Summit Climb led by Billy Nugent and the Five Day Summit Climb led by Garrett Stevens were forced to call 13,000' their high point today. The teams reported high winds, low visibility, and a descending cloud cap. The teams will rest for a short time at Camp Muir before beginning their descent to Paradise. We expect to see them back in Ashford early this afternoon.
Leave a Comment For the Team

Mt. Rainier: May 24th Summit!

The Four Day Summit Climb Team led by Adam Knoff reached the summit of Mt. Rainier at about 7:00am this morning. Adam and Team reported great climbing conditions with light winds and clear skies above 6,000’. We expect the team back to Ashford Basecamp this afternoon. Congratulations to Today's teams!
Leave a Comment For the Team (1)

Great effort on everyone’s part

Great time. Great day great memory’s

Posted by: Stan Golovac on 5/25/2014 at 5:49 am

Previous Page   Next Page
Filter By:

check the Summit Registry try our Adventure Finder alerts for 2026 RAINIER DATES
Back to Top