Mt. Rainier: Emmons Seminar Checks In With Their Status

RMI Guide Ben Liken called from Camp Schurman on the Emmons Route. The team left at 4am this morning breaking trail as well as shoveling their way to 13,300'. Due to the length of day and high winds, they chose to make 13,300' the high point for the day. It is currently raining at Camp Schurman. They are going to do some crevasse rescue this afternoon and plan to descend back to the trailhead in the morning.

Comments (2)

Good luck, Bill!  We’re rooting for you!

Posted by: Ann Gawalt and Brian Rushforth on

Good luck Bill and Chris!

Posted by: Thomas J Lapato on

Leave a comment for the team

* required fields

More to Explore

Mt. Elbrus: Gorum & Team Climb to 15,000’ on Acclimatization Hike

July 11, 2019

Huascaran: Elias & Team Ready for Next Objective

July 11, 2019

Filter By:

check the Summit Registry try our Adventure Finder