×

Log In

Need an RMI account? Create an account

Register With Us

Already have an account?

*required fields

The password must meet the following criteria:

  • At least 8 characters
  • At least 1 lowercase letter
  • At least 1 uppercase letter
  • At least 1 number
  • At least 1 symbol (allowed symbols: !?@#$%^&/*()[]{}><,.+-=;)

Keep up to date with information about our latest climbs by joining our mailing list. Sign up and we'll keep you informed about new adventures, special offers, competitions, and news.

Privacy Policy

×
×

Check Availability

RMI Logo

Mt. McKinley: Haugen & Team Carry Heavy Loads

A crisp early morning wake up in basecamp meant great traveling conditions for us as we eased our way up the glacier. It froze solid last night making our travel through crevassed terrain much safer. We carried our full loads of climbing and camping supplies as well as 21 days of food and fuel. Even with each of our sled and backpack combos nearing 100 lbs., we made the move to our new camp in exactly five hours. We are all feeling very fortunate to be sharing this extraordinary place with such a strong team. RMI Guide Mike Haugen

On The Map


Comments (2)

Hi Jeff.  I’ll be glad to share some of this 96 F heat with you.  Love ya!  Dad

Posted by: allen on

Yeah Patrick. I hope all your hard training is paying off.

Posted by: Sam on

Leave a comment for the team

* required fields

More to Explore

Mt. Rainier: June 17th - Summit Climbs on Top!

June 17, 2011

Mt. McKinley: Jones & Team Summit!

June 17, 2011

Filter By:

check the Summit Registry try our Adventure Finder
Back to Top